MEAG Substation #4 – Fort Valley
MEAG Substation #4 – Fort Valley
Fort Valley, Georgia–2018
Services: Construction Materials Testing
Clients: MEAG Power
Project Detail
Geo-Hydro provided construction materials testing for the construction of a MEAG Power Substation located off Highway 96 in Fort Valley, Georgia. The substation was constructed on a 1.5-acre site. The site required mass grading consisting of approximately 2,000 cubic yards of structural fill. During mass grading, Geo-Hydro provided subgrade evaluations and field density testing.